Program changes for Rocky Mountain Power Wattsmart® Business – Idaho

Program changes for Rocky Mountain Power Wattsmart® Business in Idaho effective November 17, 2025.

Quick Links

Wattsmart® Business is always looking for ways to improve our program and make it easier for you to serve your customers with the best products and incentives. Our program evolves as technology changes, and as we gain insights from experience. Rocky Mountain Power is planning updates to the Wattsmart Business program in Idaho that will be effective November 17, 2025.  We’ll have new approaches for lighting, New Construction/Major Renovation and non-lighting incentives.

Lighting: Plug and Play Controls Ready 🌟New🌟

We developed this category in response to emerging lighting technology, and it applies to all lighting offers. Plug and Play Controls Ready lighting offers you flexibility with receptacles that allow for a toolless addition of controls during installation or in the future. If your customer opts for controls in the future, there’s no need to rewire the system, which cuts your labor costs. Several incentives are available in this category:

  • You may submit for the plug-and-play lighting incentive at the time of installation.
  • If the fixtures include a module, plug-and-play controls can be submitted as a Networked Lighting Controls or Advanced Networked Lighting Controls project, and we will honor the highest incentive for your customer.
  • You may submit for a controls-only project incentive in the future.

Incentive Table

Lighting: Retrofits incentives

Express incentives

We are introducing an Express path to allow you to apply for most lighting projects on a post-purchase application process, which can be quickly submitted through the new online tool. Unlike past prescriptive incentives that calculated the incentive amount per fixture, Express incentives offer an incentive amount per watt installed and are not limited to specific retrofit kit/fixture categories. Express excludes replacement lamps, controls only, new construction and major renovation, and projects where there is an LED baseline and has different rates for interior and exterior installations.

  • Uses classifications
    • No controls
    • Plug and Play Controls Ready
    • NLCs
    • Luminaire Level Lighting Controls

Small and Medium Business Express incentives

We are expanding the previous Small Business Enhanced category to include medium-sized businesses too. This category uses the Express incentive structure described above, and this new category will be referred to as SMBE.

The original 75% incentive cap still applies, but you have more opportunities to achieve it. Rather than one set incentive of 75%, SMBE offers higher incentive levels.

The Express category excludes replacement lamps, is phasing out the lighting tool and offers you a new eligibility site.

Calculated (non-prescriptive)

Our non-prescriptive path goes by a few names such as calculated, typical or simply the lighting tool path. We’re making some enhancements to the lighting tool.

The biggest change is that there is one incentive rate for all customer sizes, eliminating segmentation in the tool. The Basic Controls category is being replaced with Plug and Play Controls Ready. This is the exclusive path for controls-only projects. You can receive lighting incentives for most product types in the tool, with the exception of replacement lamps, which are excluded from this category.

Exterior lighting

The following new measures have been added:

  • No controls
  • Basic or NLC
  • ANLC

All non-general illuminance will now be grouped in the non-prescriptive custom category.

Incentive Table

Midstream lighting incentives

This is the exclusive path for replacement lamps. As part of our program changes, the LED Instant Incentive and the existing post-purchase application are now replaced with the Express offering. Fixtures, kits, and controls will all be available downstream in the Express application or lighting tool.

The fullstream model of shared incentives is now combined into a midstream exclusive offer for replacement lamps. Incentives will be paid to the participating distributor, who may pass the incentive through to the customer. Approved midstream trade allies may submit via single-sale log entries or via bulk uploads. If you are not signed up as a participating distributor, please contact us to apply.

Incentive Table

New Construction/Major Renovation

New Construction/Major Renovation lighting incentives are changing to a tiered pay-for-savings structure where various incentive amounts per kilowatt hour apply based on the type of controls used.

Interior lighting

  • No controls
  • NLC
  • ANLC

Exterior lighting

New measures added include:

  • No controls
  • Basic dimming controls
  • ANLC dimming controls

Incentive Table

Non-lighting incentives

The Green Motor Rewinds incentive is being removed from the program. 

TRANSITION PLAN:  

For projects requiring pre-approval, see the table to understand which incentive applies.
For post-purchase projects, the earlier invoice date for the project is used to determine which version of the program applies.

Offer Letter dated prior to 10/2/25; projects completed prior to10/2/25 We will use the program version in effect when the incentive offer letter was issued. 
Offer Letter dated from 10/2/25-11/16/25 Option to run on either incentive structure.
Offer Letter dated 11/17/25 or later New program with changes is in full effect.

 Incentive Table

QUESTIONS? Contact us, we are happy to help!